{"id":9468,"date":"2026-11-11T16:32:36","date_gmt":"2026-11-11T16:32:36","guid":{"rendered":"https:\/\/rfamw.com\/?p=9468"},"modified":"2026-11-11T16:51:41","modified_gmt":"2026-11-11T16:51:41","slug":"m01-tolled-road-rehabilitation-takes-shape-as-fuel-levy-used-to-supplement-toll-fees","status":"publish","type":"post","link":"https:\/\/rfamw.com\/index.php\/2026\/11\/11\/m01-tolled-road-rehabilitation-takes-shape-as-fuel-levy-used-to-supplement-toll-fees\/","title":{"rendered":"M01 TOLLED ROAD REHABILITATION TAKES SHAPE, AS FUEL LEVY USED TO SUPPLEMENT TOLL FEES"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">M01 TOLLED ROAD REHABILITATION TAKES SHAPE, AS FUEL LEVY USED TO SUPPLEMENT TOLL FEES<\/h2>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/rfamw.com\/wp-content\/uploads\/2026\/11\/WhatsApp-Image-2026-11-11-at-6.21.50-PM-1024x768.jpeg\" alt=\"\" class=\"wp-image-9495\" srcset=\"https:\/\/rfamw.com\/wp-content\/uploads\/2026\/11\/WhatsApp-Image-2026-11-11-at-6.21.50-PM-1024x768.jpeg 1024w, https:\/\/rfamw.com\/wp-content\/uploads\/2026\/11\/WhatsApp-Image-2026-11-11-at-6.21.50-PM-300x225.jpeg 300w, https:\/\/rfamw.com\/wp-content\/uploads\/2026\/11\/WhatsApp-Image-2026-11-11-at-6.21.50-PM-768x576.jpeg 768w, https:\/\/rfamw.com\/wp-content\/uploads\/2026\/11\/WhatsApp-Image-2026-11-11-at-6.21.50-PM-900x675.jpeg 900w, https:\/\/rfamw.com\/wp-content\/uploads\/2026\/11\/WhatsApp-Image-2026-11-11-at-6.21.50-PM.jpeg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The rehabilitation of the M01 tolled road has registered good progress, with <strong>46 percent<\/strong> road works completed along Masasa to Kachipeya road section.<\/p>\n\n\n\n<p>The contractor has resealed potholes, reconditioned shoulders and asphalt resealing of <strong>4.4km stretch<\/strong> out of the <strong>9.56km<\/strong> target.<\/p>\n\n\n\n<p>We are optimistic at this pace, that should all things being equal, the contractors will catch up with lost time and finish the works within the scheduled time frame, reiterated Roads Authority Acting Chief Maintenance Engineer, Derrick Manda.<\/p>\n\n\n\n<p>This was revealed on 11 November 2026, during the Tolled Road Media Tour Update organized by the Roads Fund Administration in conjunction with the Roads Authority.<\/p>\n\n\n\n<p>The works have already changed the face of Lizulu Trading Centre, with completed bus bays and drainage systems allowing free flow of traffic and parking area.<\/p>\n\n\n\n<p>\u201cWe are happy with the development, we noted that the road works are of high standard and with enlarged carriageway which has significantly improved traffic flow at the trading centre, said Elisa Kagulo a shop owner at Lizulu Trading Centre.<\/p>\n\n\n\n<p>Kagulo further requested the contractor to improve road safety at Lizulu by providing zebra crossing and rumble surfaces for speed control to avoid road accidents.<\/p>\n\n\n\n<p>In his briefing, the RFA Toll Operations Manager, Dalitso Kadzamira indicated that the M01 tolled road rehabilitation is being financed partly using toll fees and fuel levy. \u201cThe total rehabilitation cost is <strong>K113billion,<\/strong> of which the big percent is from fuel levy.\u201d<\/p>\n\n\n\n<p>Kadzamira reported that, during the third quarter, the tollgates had raked in <strong>K2.1billion<\/strong> compared to <strong>K1.2billion<\/strong> registered during the same period last year.<\/p>\n\n\n\n<p>On expenditure the RFA had disbursed a total of <strong>K32.7billion<\/strong> in advance payments and completed road works.<\/p>\n\n\n\n<p>The toll update is part of RFA promotion of transparency and accountability of toll fee collection and utilization, where the RFA commits to periodically update the public on toll collection and utilization of toll fees on a quarterly basis.<\/p>\n\n\n\n<p>Currently the RFA has only two tollgates along the M01 road, the tollgates have been operational for a period of six years.<\/p>\n\n\n\n<p>The RFA is planning to increase the number of new tollgates to six with four tollgates to be constructed during this financial year 2026\/27.<\/p>\n\n\n\n<p>\u201cThe Roads Authority has finanlised the procurement processes for the for upcoming tollgates which will be constructed within the next eight months from now\u201d reiterated Kadzamira.<\/p>\n\n\n\n<p>The four tollgates are to be constructed along the M1 at Khamanga in Dowa after Mponela, Gwayi in Kasungu after Nkhamenya, Naluva in Salima along the Lilongwe Salima road and Chileka along Lilongwe Mchinji road.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"792\" data-id=\"9492\" src=\"https:\/\/rfamw.com\/wp-content\/uploads\/2019\/09\/media-RFA-Tour-8-1024x792.jpeg\" alt=\"\" class=\"wp-image-9492\" srcset=\"https:\/\/rfamw.com\/wp-content\/uploads\/2019\/09\/media-RFA-Tour-8-1024x792.jpeg 1024w, https:\/\/rfamw.com\/wp-content\/uploads\/2019\/09\/media-RFA-Tour-8-300x232.jpeg 300w, https:\/\/rfamw.com\/wp-content\/uploads\/2019\/09\/media-RFA-Tour-8-768x594.jpeg 768w, https:\/\/rfamw.com\/wp-content\/uploads\/2019\/09\/media-RFA-Tour-8-900x696.jpeg 900w, https:\/\/rfamw.com\/wp-content\/uploads\/2019\/09\/media-RFA-Tour-8.jpeg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>M01 TOLLED ROAD REHABILITATION TAKES SHAPE, AS FUEL LEVY USED TO SUPPLEMENT TOLL FEES The rehabilitation of the M01 tolled road has registered good progress, with 46 percent road works completed along Masasa to Kachipeya road section. The contractor has resealed potholes, reconditioned shoulders and asphalt resealing of 4.4km stretch out of the 9.56km target.<\/p>\n","protected":false},"author":3,"featured_media":9488,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[125,103,102],"_links":{"self":[{"href":"https:\/\/rfamw.com\/index.php\/wp-json\/wp\/v2\/posts\/9468"}],"collection":[{"href":"https:\/\/rfamw.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rfamw.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rfamw.com\/index.php\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/rfamw.com\/index.php\/wp-json\/wp\/v2\/comments?post=9468"}],"version-history":[{"count":2,"href":"https:\/\/rfamw.com\/index.php\/wp-json\/wp\/v2\/posts\/9468\/revisions"}],"predecessor-version":[{"id":9496,"href":"https:\/\/rfamw.com\/index.php\/wp-json\/wp\/v2\/posts\/9468\/revisions\/9496"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rfamw.com\/index.php\/wp-json\/wp\/v2\/media\/9488"}],"wp:attachment":[{"href":"https:\/\/rfamw.com\/index.php\/wp-json\/wp\/v2\/media?parent=9468"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rfamw.com\/index.php\/wp-json\/wp\/v2\/categories?post=9468"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rfamw.com\/index.php\/wp-json\/wp\/v2\/tags?post=9468"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}